mercury Workshop Repair Guides

Mercury Workshop Service and Repair Manuals

Aisin AW21 - Main Control Valve Body|Page 5211 > < Aisin AW21 - Main Control Valve Body|Page 5209
Page 14
background image

7. Install the Leadframe Guide Pins in the solenoid body to align the lead frame for installation.

8. Position the leadframe on the Leadframe Guide Pins and carefully install the leadframe by pushing straight down into the solenoids.

9. Remove the Leadframe Guide Pins.

10. Install the 5 leadframe screws.

11. Connect the OSS sensor electrical connector.

12. Connect the TR sensor electrical connector.

Aisin AW21 - Main Control Valve Body|Page 5211 > < Aisin AW21 - Main Control Valve Body|Page 5209