mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Lever Cable <--> [Shift Cable, A/T]|Adjustments|Page 3480 > < A/T - Shift Control Solenoid Valve Revision|Page 3475
Page 1
background image

Lever Cable: Adjustments

Fig. 5  Shift Lock Cable Adjustment

1.

With selector lever in ``P'' position, install end of shift lock cable to shift lock lever.

2.

Pull shift lock cable in direction indicated in Fig. 5 until resistance is felt and adjust so spring hook projection of shift lock lever is positioned
within range marked A in Fig. 5 relative to spring pin.

3.

Move shift lock cable toward lower end of cable attaching bracket and tighten nut.

4.

Ensure stop light comes on when brake pedal is depressed.

Lever Cable <--> [Shift Cable, A/T]|Adjustments|Page 3480 > < A/T - Shift Control Solenoid Valve Revision|Page 3475