mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 2393 > < Initial Inspection and Diagnostic Overview|Page 2391
Page 106
background image

STEP 15. Check the wiring harness between power window relay connector C-116 (terminal 4) and power window main switch connector E-12
(terminal 6).

NOTE:  Also check junction block connector C-111 and intermediate connector C-91. If junction block connector C-111 or intermediate connectors
C-91 is damaged, repair or replace the connector as described in Harness Connector Inspection.

Q: Is the wiring harness between power window relay connector C-116 (terminal 4) and power window main switch connector E-12 (terminal 6) in good
condition?

YES: Replace the ETACS-ECU. Check that the power windows work normally.

NO: Repair the wiring harness. Check that the power windows work normally.

Inspection Procedure D-2

Power Window: The Power Window Timer does not Work Normally.

NOTE:  This troubleshooting requires use of scan tool MB991958 and SWS monitor kit MB991862. For details of how to use the SWS monitor, refer
to "How to use SWS monitor."  See: Reading and Clearing Diagnostic Trouble Codes/How To Use SWS Monitor

Initial Inspection and Diagnostic Overview|Page 2393 > < Initial Inspection and Diagnostic Overview|Page 2391