Eclipse V6-3.8L (6G75) (2006)
YES: Go to Step 5.
NO: Go to Step 4.
STEP 4. Check the wiring harness between liftgate latch switch connector F-09 (terminal 2) and ground.
Q: Is the wiring harness between liftgate latch switch connector F-09 (terminal 2) and ground in good condition?
YES: No action is necessary and testing is complete.
NO: The wiring harness may be damaged or the connector(s) may have loose, corroded or damaged terminals, or terminals pushed back in the
connector. Repair the wiring harness as necessary. If the functions described in "CIRCUIT OPERATION" work normally, the input signal from
the liftgate latch switch should be normal.
STEP 5. Check ETACS-ECU connector C-218 for loose, corroded or damaged terminals, or terminals pushed back in the connector.
Q: Is ETACS-ECU connector C-218 in good condition?
YES: Go to Step 6.
NO: Repair or replace the damaged component(s). Refer to Harness Connector Inspection. If the functions described in "CIRCUIT
OPERATION" work normally, the input signal from the liftgate latch switch should be normal.