mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Throttle Body|Testing and Inspection|Page 2348 > < Throttle Body|Testing and Inspection
Page 2
background image

12. Remove Air Metering Fitting MB995050 from the intake manifold PCV nipple. Reinstall the PCV valve hose.
13. Uncap the throttle body idle purge nipple and connect the idle purge line.
14. Remove the scan tool.

Throttle Body|Testing and Inspection|Page 2348 > < Throttle Body|Testing and Inspection