mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Manual Shut-down Lever, Diesel|Locations|Page 823 > < Manual Shut-down Lever, Diesel|Locations|Page 821
Page 7
background image

[9] Inspection of boost pressure sensor

-

Mount pressure gauge A for boost pressure measurement as shown in the diagram.

-

Connect the MUT-II.

-

Set the MUT-II for boost pressure measurement

-

Start the engine. Compare the value displayed on the MUT-II and the value indicated by pressure gauge A. If the values are different, replace
boost pressure sensor 9.

B : To inlet manifold.

[10] Inspection of control rack position sensor

Perform the following inspections. If any abnormality is evident, have inspection and repair performed by the nearest MFTA Dealer.

-

Measurements on connectors

Measure the resistances between the following terminals: 3-pin connector's 3 and 4; 10-pin connector's 3 and 9; 4 and 9.

[12] Inspection of linear DC motor

Perform the following inspections. If any abnormality is evident, have inspection and repair performed by the nearest MFTA Dealer.

1. Measurements on connectors

Measure the resistance between terminals 1 and 2 on each connector.

Manual Shut-down Lever, Diesel|Locations|Page 823 > < Manual Shut-down Lever, Diesel|Locations|Page 821