mitsubishi Workshop Repair Guides

Mitsubishi Galant Workshop Service and Auto Repair Manuals

Magnetic Switch Pull-In Test|Page 4144 > < Magnetic Switch Pull-In Test
Page 1
background image

Starter Solenoid: Testing and Inspection
Magnetic Switch Hold-In Test

Fig. 7  Testing Magnetic Switch Hold-In Function

1.

Disconnect field coil wire from ``M'' terminal of magnetic switch, Fig. 7.

2.

Connect a 12 volt battery between ``S'' terminal and body ground. This test must be performed in less than 10 seconds to prevent coil from
burning out.

3.

If pinion remains out, magnetic switch is operating correctly. If pinion moves in, hold-in circuit is open and the magnetic switch must be replaced.

Magnetic Switch Pull-In Test|Page 4144 > < Magnetic Switch Pull-In Test