Galant LS V6-3.0L SOHC (1999)
Headliner: Service and Repair
Pre-removal and Post-installation Operation
Front Pillar Trim, Center Pillar Lower Trim and Rear Pillar Trim Removal and Installation.
Headliner: Service and Repair
Pre-removal and Post-installation Operation
Front Pillar Trim, Center Pillar Lower Trim and Rear Pillar Trim Removal and Installation.