mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Wastegate|Locations|Page 3266 > < Wastegate|Locations|Page 3264
Page 1
background image

Wastegate: Testing and Inspection

Wastegate Actuator Operational Test

1.

Connect a suitable pressure tester (with a pressure source) to the pressure hose fitting.

2.

Apply approx. 9.2 psi (63 kPa) pressure to the actuator and check that the rod moves.
CAUTION:  Do not apply a pressure in excess of 10.3 psi (71 kPa) to the actuator, damage may result.

3.

Ensure that the pressure does not bleed off.

4.

If the actuator fails to operate properly, replace the actuator.  Never attempt to adjust the wastegate valve.

Wastegate|Locations|Page 3266 > < Wastegate|Locations|Page 3264