mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Battery Inspection|Page 4158 > < Battery Inspection
Page 1
background image

Battery: Testing and Inspection
Battery Charging

BATTERY CHARGING 

CAUTION:  
-

When batteries are being charged, an explosive gas forms beneath the cover of each cell. Do not smoke near batteries on charge or which have
recently been charged.

-

Do not break live circuits at the terminals of the batteries on charge. A spark will occur where the live circuit is broken.

-

Keep all open flames away from the battery.

Battery electrolyte temperature may temporarily be allowed to rise to 55°C (131°F). Increase of electrolyte temperature above 55°C (131 °F) is
harmful to the battery, causing deformation of battery cell, decrease in life of battery, etc.

CHARGE RATE 

If the test indicator is white, the battery should be charged as outlined below.

OPEN CIRCUIT VOLTAGE TEST (3) 

1. Turn headlights on for 1 5 seconds.

2. Turn headlights off for 2 minutes to allow battery voltage to stabilize.

3. Disconnect cables.

4. Read open circuit voltage.

5. If the open circuit voltage is under 12.4 volts, charge the battery.

LOAD TEST (4) 

1. Connect a load tester to the battery.

2. Load the battery at 15 amps for 15 seconds to remove surface charge.

3. Load the battery at the recommended discharge rate. (See LOAD TEST RATE CHART)

4. Read voltage after 1 5 seconds and then remove the load.

5. If the voltage is not maintained at the minimum voltage in the LOAD TEST CHART throughout the test, the battery should be replaced.

When the dot appears or when maximum charge shown below is reached, charging should be stopped.

Battery Inspection|Page 4158 > < Battery Inspection