Lancer L4-2.0L (4B11) (2008)
CONTENTS OF BOOT KIT
WARRANTY INFORMATION
This bulletin is supplied as information only and is not an authorization to repair. Repairs are to be made on a complaint basis only. If an affected vehicle
is diagnosed with the above condition repair as described in this bulletin and submit a normal warranty claim as follows:
Repair Procedure
REPAIR PROCEDURE
A. LEFT FRONT DRIVESHAFT (ALL)
RIGHT FRONT DRIVESHAFT FOR THE FOLLOWING VEHICLES ONLY:
^
Outlander 2.4L
^
Outlander V6 with 2WD, Outlander GT (S-AWC)
Refer to Section B for all other vehicles.
1. Replace the EBJ (outer joint) boot. Refer to Group 26 - Front Axle of the applicable Service Manual for instructions.
CAUTION!
- Thoroughly clean all of the old grease from the boot and joint. Only a small amount of grease can remain in the joint for reassembly.
NOTE:
Installing the EBJ boot securing bands requires the use of a band tightening tool such as MB991561.
The bands have a specific tightening procedure described in the service manual.
Use the small grease container (labeled NKG 509) for the EBJ. Put approximately 50% of the container in the boot and 50% in the joint.