mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Campaign - AWC ECU Software Update|Page 3643 > < Campaign - AWC ECU Software Update|Page 3641
Page 4
background image

WARRANTY INFORMATION 

Reprogramming Procedure

BATTERY VOLTAGE (AS MEASURED AT THE BATTERY POSTS WITHOUT ELECTRICAL LOAD) MUST BE KEPT AT 12.4V OR HIGHER
IN ORDER TO REPROGRAM THE ECM. MEASURE THE BATTERY VOLTAGE AND CHARGE AS NECESSARY. A BATTERY CHARGER
SHOULD BE CONNECTED TO THE VEHICLE'S BATTERY DURING THE REPROGRAMMING PROCEDURE. DO NOT ALLOW THE
BATTERY CHARGER TO TIME OUT.

NOTE:

VCI Stand-alone reprogramming is not available for this procedure. The laptop and the VCI must remain connected for the entire procedure.

Connect the equipment as follows:

^ Turn the laptop computer on. If you're running on battery power and the charge indicator in the lower right hand corner of the screen does not show a

full charge it is recommended that either the laptop battery be charged prior to beginning or that reprogramming be completed with the A/C power
adaptor connected to the laptop.

^ Connect the USB cable to the VCI.

^ When the laptop displays the MUT-III main screen connect the USB cable to the laptop.

^ Connect the MUT-III main harness with the blue DLC connection to the VCI.

Campaign - AWC ECU Software Update|Page 3643 > < Campaign - AWC ECU Software Update|Page 3641