Lancer LS L4-2.0L SOHC (2002)
REMOVAL AND INSTALLATION
INSTALLATION SERVICE POINTS
>>A<< VACUUM HOSE CONNECTION
Insert the vacuum hose to the brake booster with its paint mark facing upward, and then secure the hose by using the hose clip.
>>B<< PUSH ROD PROTRUSION AMOUNT CHECK AND ADJUSTMENT
1. Measure dimension (A).
Standard value (A): 9.18 - 9.43 mm (0.361 - 0.371 inch)
NOTE: When a negative pressure of 66.7 kPa is applied to the brake booster, the push rod should protrude 10.28 10.53 mm (0.405 - 0.415
inch).