mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 1968 > < Initial Inspection and Diagnostic Overview|Page 1966
Page 42
background image

3. Measure the voltage between terminal 2 and ground.

-

The voltage should be approximately 12 volts (battery positive voltage).

Q: Is the measured voltage approximately 12 volts (battery positive voltage)?

YES: Go to Step 8.

NO: Go to Step 7.

Initial Inspection and Diagnostic Overview|Page 1968 > < Initial Inspection and Diagnostic Overview|Page 1966