mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Air Conditioning Switch|Testing and Inspection|Page 3096 > < Air Conditioning Switch|Testing and Inspection
Page 1
background image

Air Conditioning Switch: Service and Repair

HEATER CONTROL ASSEMBLY, A/C SWITCH AND INSIDE/OUTSIDE CHANGEOVER SWITCH

INSTALLATION SERVICE POINT
>>A<< HEATER CONTROL ASSEMBLY INSTALLATION

Follow the steps below to install the air outlet changeover damper link cable and air mix damper lever cable.

1. Set the air outlet changeover control knob on the heater control assembly to the defroster position.
2. Set the air outlet changeover damper link of the heater unit to the defroster position as shown in the illustration, and then connect the cable to the

link pin.

3. Push the outer cable in the arrow so that there is no looseness, and then secure it with clip.

Air Conditioning Switch|Testing and Inspection|Page 3096 > < Air Conditioning Switch|Testing and Inspection