mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 6381 > < Initial Inspection and Diagnostic Overview|Page 6379
Page 47
background image

YES: Go to Step 2.

NO: Repair or replace the damaged component(s). Refer to Harness Connector Inspection. Check that the input signal of ignition switch (ACC) is
normal.

STEP 2. Check the ignition switch (ACC) line of the power supply circuit to the ETACS-ECU. Measure the voltage at ETACS-ECU connector
C-317.

1. Disconnect ETACS-ECU connector C-317 and measure the voltage available at the junction block side of the connector.
2. Turn the ignition switch to the "ACC" position.

3. Measure the voltage between terminal 7 and ground.

-

The voltage should measure approximately 2 volts (battery positive voltage).

Q: Is the measured voltage approximately 2 volts (battery positive voltage)?

YES: Replace the ETACS-ECU. Check that the input signal of ignition switch (ACC) is normal.

NO: Go to Step 3.

STEP 3. Check the wiring harness between ETACS-ECU connector C-317 (terminal 7) and the ignition switch (ACC).

Q: Is the wiring harness between ETACS-ECU connector C-317 (terminal 7) and ignition switch (ACC) in good condition?

YES: No action is necessary and testing is complete.

NO: The wiring harness may be damaged or the connector (s) may have loose, corroded or damaged terminals, or terminals pushed back in the
connector. Repair the wiring harness as necessary. Check that the input signal of ignition switch (ACC) is normal.

Inspection Procedure 2

Inspection Procedure 2: ETACS-ECU does not receive any signal from the ignition switch (IG1).

Ignition Switch (IG1) Input Circuit Part 1

Initial Inspection and Diagnostic Overview|Page 6381 > < Initial Inspection and Diagnostic Overview|Page 6379