mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 2137 > < Initial Inspection and Diagnostic Overview|Page 2135
Page 128
background image

Q: Are front power window sub-switch (RH) connector E-16 and front power window motor (RH) connector E-21 in good condition?

YES: Go to Step 16.

NO: Repair or replace the damaged components). Refer to Harness Connector Inspection. The front power window (RH) function should work now
normally.

STEP 16. Check the wiring harness between front power window sub-switch (RH) connector E-16 (terminals 7 and 6) and front power window
motor (RH) connector E-21 (terminals 2 and 1).

NOTE: Also check intermediate connector E-22 for loose, corroded or damaged terminals, or terminals pushed back in the connectors. If intermediate

connectors E-22 is damaged, repair or replace the damaged components) as described in Harness Connector Inspection.

Q: Is the wiring harness between front power window sub-switch (RH) connector E-16 (terminals 7 and 6) and front power window motor (RH)

connector E-21 (terminals 2 and 1) in good condition?

YES: No action is necessary and testing is complete.

Initial Inspection and Diagnostic Overview|Page 2137 > < Initial Inspection and Diagnostic Overview|Page 2135