Prowler V6-3.5L VIN G (1999)
INSTALL
1. Install the intermediate steering shaft flex joint on the steering column shaft. Install the pinch bolt in the flex joint. Tighten the pinch bolt to a
torque of 41 Nm (30 ft. lbs.).
2. Align master spline on intermediate steering shaft coupler with master spline steering gear input shaft. Install the intermediate steering shaft
coupler on steering gear input shaft until fully seated.
3. Start roll pin into intermediate steering shaft coupler by lightly tapping it with a soft face hammer.
4. Install Roll Pin Installer, Special Tool 6831A, or equivalent through intermediate steering shaft coupler and roll pin. Using a wrench, hold
threaded bolt on Roll Pin Installer, Special Tool 6831A, or equivalent from rotating. Using a second wrench, tighten nut against sleeve of special
tool. This will pull the roll pin into the intermediate steering shaft coupler. Install roll pin until exposed end is flush with coupler.
5. Lower the vehicle.
6. Road test vehicle to verify proper operation of the steering system.