G6 V6-3.9L (2009)
Caution: Refer to Fastener Caution (See: Service Precautions/Vehicle Damage Warnings/Fastener Caution).
2. Install the high pressure relief valve.
Tighten the valve to 8 Nm (70 lb in).
3. Install the air conditioning compressor. Refer to Air Conditioning Compressor Replacement (LZE, LZ4, LZ9) (See: Compressor HVAC/Service
and Repair)Air Conditioning Compressor Replacement (LY7) (See: Compressor HVAC/Service and Repair)Air Conditioning Compressor
Replacement (LE5) (See: Compressor HVAC/Service and Repair).
4. Evacuate and recharge the refrigerant system. Refer to Refrigerant Recovery and Recharging (See: Service and Repair/Procedures/Refrigerant
Recovery and Recharging).
5. Leak test the fittings of the component using J 39400-A .