pontiac Workshop Repair Guides

Pontiac Workshop Service and Repair Manuals

Deployment Procedures|Page 5606 > < Deployment Procedures|Page 5604
Page 22
background image

19. Cut 2 4.6 m (15 ft) deployment wires from a 0.8 mm2 (18 gage) or thicker multi-strand wire. These wires will be used to fabricate the passenger

deployment harness.

20. Strip 13 mm (0.5 in) of insulation from both ends of the wires cut in the previous step.
21. Twist together 1 end from each of the wires in order to short the wires.

22. Twist together 1 connector wire lead to one deployment wire (1). Secure the connection mechanically.
23. Bend the twisted connection (2) flat. Wrap the connection tightly and securely with electrical tape. The tape will also insulate the connection.
24. Secure the remaining connector wire lead (3) to the remaining deployment wire.
25. Connect the deployment harness to the side impact module - right connector.

26. Route the deployment harness out of the passenger side of the vehicle.
27. Clear the inside and outside of the vehicle of any people or loose and flammable objects.
28. Stretch the driver harness to full length.
29. Stretch the passenger harness to full length.
30. Completely cover the windshield and front door window openings with a drop cloth.

Deployment Procedures|Page 5606 > < Deployment Procedures|Page 5604