porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Procedures|Page 1389 > < Procedures|Page 1387
Page 16
background image

^

Drei Bond or Loctite 1209 (optional)

17. Prepare crankcase half 4-6 to fit it onto crankcase half 1-3. Carefully grease sealing faces of both halves with acetone. Align connecting rods 4-6

vertically upwards and fold timing chain.

18. Apply sealant to the sealing face of crankcase half 4-6.

19. With the help of a second person, place crankcase half 4-6 in position on crankcase half 1-3. Knock gently on crankcase half -6 using a plastic

hammer. Pull timing chain out through chain space using a bent welding wire.

20. Position four new, coated M6 35 Torx screws -1- on flywheel side.

Procedures|Page 1389 > < Procedures|Page 1387