porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Adjusting Timing of Cylinder Bank 1-3 - Engine Installed|Page 1492 > < Lifter / Lash Adjuster, Valve|Specifications|Page 1489
Page 1
background image

Lifter / Lash Adjuster: Adjustments
Adjusting Timing of Cylinder Bank 1-3 - Engine Installed

Adjusting timing at cylinder bank 1 - 3 

1. Position special tool, adjustment device 9612/9, on the cylinder head or the camshaft bores.

2. If the special tool cannot be inserted in the bores, allocate the camshafts accordingly and turn the exhaust camshafts with an open-ended wrench

(wrench size 24) until the adjustment device can be inserted with ease. Fasten adjustment device with a hexagon-head bolt M8 x 30.

3. Fasten four hexagon-head bolts (M6 x 15) on the chain sprocket.
4. Take special tool, adjustment device 9612/9, off the cylinder head.

5. Fasten special tool, holding-down device 9634, on the cylinder head using a hexagon-head bolt M8 x 30.

Note:  Only remove holding-down device 9634 when the cylinder head cover has been fitted.

6. Remove holding-down device (special tool 9611) from the camshaft bearing saddles.

Adjusting Timing of Cylinder Bank 1-3 - Engine Installed|Page 1492 > < Lifter / Lash Adjuster, Valve|Specifications|Page 1489