porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Adjusting Timing of Cylinder Bank 1-3 - Engine Installed|Page 1495 > < Adjusting Timing of Cylinder Bank 1-3 - Engine Installed|Page 1493
Page 2
background image

7. Prepare cylinder head cover for installation: Clean sealing surface of the cylinder head and cylinder head cover very carefully. Apply a silicone

bead to the cylinder head cover. 

8. Carefully place the cylinder head cover in the correct position so that the sealing bead is not damaged. Screw two studs or centering pins into the

corners of the cylinder head as centering aids. Tightening torque 13 Nm (10.0 ft. lbs.) Observe tightening sequence.

9. Remove holding-down device 9634.

10. Immediately remove silicone material emerging in the area of the camshaft closure cap.

11. Fit oil extraction pump. Align oil extraction pump driver and fit oil extraction pump in the correct position. The arrow for the direction of rotation

or the marking "4 - 6" must face the crankcase.

12. Fit camshaft closure caps (6 ea.) dry.
13. Take off auxiliary chain tensioner, fit original chain tensioner with new sealing ring. Tightening torque: 80 Nm (59 ft. lbs.) 

Allocation of chain tensioners 

14. Pull fixing pin off belt pulley.

Adjusting Timing of Cylinder Bank 1-3 - Engine Installed|Page 1495 > < Adjusting Timing of Cylinder Bank 1-3 - Engine Installed|Page 1493