911 Carrera 4 Cabriolet (997) F6-3.6L (2006)
screws of the fuel distributor pipe to the intake distributor -1-. Tighten screws Tightening torque 7.5 ftlb..
6. Lift engine into position with the car jack and fasten Tightening torque 63 ftlb.
Cable Plug For Injection Valves
7. Move cable duct into position on the fuel distributor pipe and clip in. Connect cable plugs for switch-over valve -1- and camshaft position sensor
-2-.
Switch-over Valve Connections
8. Fit cable plug to switch-over valve -1-. Fit vacuum pipes to the switch-over valve -4-.
Plastic Lines
9. Separate the tie-wraps and move lines into the installation position.
Cable Holder
10. Fit cable holders by pushing onto intake distributor and fuel distributor tube. Clip plastic lines into cable holders and connect and secure the
remaining lines.
Removing Hoses
11. Clip the two coolant hoses and aluminium pipe of the brake booster into the holders on the transverse member.
