porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Engine Oil Cooler Thermostat > < Removing/Installing Oil Cooler (Engine Mounted)|Page 776
Page 2
background image

4.  Loosen lower nuts and remove oil cooler upward.

 
 
Installing 

1.  When installing counterhold at the cooler connections to prevent damage.

2.  Coat connections with Optimoly HT.

3.  Check connections for leaks. This requires that the regulator for the front oil cooler he open to have oil flowing through the cooler (engine oil

temperature above 83° C/181° F).

Engine Oil Cooler Thermostat > < Removing/Installing Oil Cooler (Engine Mounted)|Page 776