porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Removing and Installing Hydraulic Valve For Valve Lift Adjustment - Engine Installed|Page 1252 > < Removing and Installing Hydraulic Valve For Valve Lift Adjustment - Engine Installed|Page 1250
Page 10
background image

5.2.

Remove drive belt. Mark belt travel direction with a colored pen. Slacken belt, turning the tensioning pulley (wrench size 24 mm) clockwise
, hold still and simultaneously take the belt off the drive pulleys.

5.3.

Undo front compressor fastening screws (2 ea.). Undo rear fastening screw between the intake pipes of cylinders 4 and 5. Disconnect the
electrical plug connection.

5.4.

Lift the compressor out, set it down with the hoses connected and secure it against being dropped.

6. Remove exhaust manifold.

7. Remove rear muffler. Undo three hexagon nuts.

Removing and Installing Hydraulic Valve For Valve Lift Adjustment - Engine Installed|Page 1252 > < Removing and Installing Hydraulic Valve For Valve Lift Adjustment - Engine Installed|Page 1250