porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Air Injection Control Valve|Service and Repair|Page 2053 > < Air Injection Control Valve|Service and Repair|Page 2051
Page 5
background image

Front threaded part, air-conditioning compressor

Figure d3: recommended 1/4 inch tool for the front compressor screw

-

e. Lift out air-conditioning compressor with connected leads. To do so, pull up the front fastening screw in the aluminium spacer sleeve and

hold it tight. Disconnect the ground cable from the plug connection and lay it to one side on a protective support. Also secure against
falling down (tie wraps).

11. Remove hose from the secondary pump -4-.
12. Remove generator.

13. Remove the cable plug of the knock sensor (cylinder bank 1 - 3) -1- and unscrew the M8 hexagon-head bolt of the knock sensor -2- ; then remove

the knock sensor. Unscrew the air line union nut (hexagon a/f 22) -3- on the distributor housing.

Air Injection Control Valve|Service and Repair|Page 2053 > < Air Injection Control Valve|Service and Repair|Page 2051