porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Procedures|Page 2140 > < Procedures|Page 2138
Page 3
background image

12. Pull the retainers off the injection valves -A- and pull the injection valves out of the fuel collection pipe -B-. Make sure that all O-rings are present

on the injection valves. Collect emerging fuel with a cloth.

Installing Injection Valves Of Cylinder Bank 1 - 3

NOTE:  Replace O-rings of the injection valves.

1. Replace O-rings of the injection valves and press the valves into the fuel collection pipe -A-. The O-rings can be sprayed, e.g. with silicone spray,

for easier assembly. Fit the retainers -B- of the injection valves correctly (they must snap into place).

2. Push the fuel collection pipe complete with injection valves into the intake pipe and insert the two M6 x 12 hexagon-head bolts of the fuel

collection pipe into the intake pipe. Make sure that the loose wiring harness is not trapped.

3. Tighten both M6 x 12 hexagon-head bolts with the correct tightening torque.

Tightening torque  10 Nm (7.5 ftlb.)

Procedures|Page 2140 > < Procedures|Page 2138