911 Turbo Cabriolet AWD (997) F6-3.6L Turbo (2008)
Installing pump unit
INFORMATION:
-
Observe allocation of hydraulic lines to pump chambers and their installation position.
-
The short hydraulic line -2- goes to the upper pump chamber in the pump unit -1-. The hydraulic line -2- points to the centre - in direction of
bracket -6- - and upwards -Arrow A-.
-
The long hydraulic line -3- goes to the lower pump chamber in the pump unit -1-. The hydraulic line -3- is routed along the pump unit -1- towards
the bottom left -Arrow B-.