porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Removal and Replacement|Page 4934 > < Removal and Replacement|Page 4932
Page 7
background image

Installing pump unit

INFORMATION:

-

Observe allocation of hydraulic lines to pump chambers and their installation position.

-

The short hydraulic line -2- goes to the upper pump chamber in the pump unit -1-. The hydraulic line -2- points to the centre - in direction of
bracket -6- - and upwards -Arrow A-.

-

The long hydraulic line -3- goes to the lower pump chamber in the pump unit -1-. The hydraulic line -3- is routed along the pump unit -1- towards
the bottom left -Arrow B-.

Removal and Replacement|Page 4934 > < Removal and Replacement|Page 4932