porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Procedures|Page 2714 > < Procedures|Page 2712
Page 49
background image

8. Clip in B+ line -3- at heater/air-conditioning unit.

8.1. Secure the B+ line to the main wire harness with the two new tie-wraps.
8.2. Clip in B+ line at heater/air-conditioning unit with the tie-wraps.

Installing B+ line from starter to transmission connection point

1. Lay B+ line -5-.

INFORMATION:  For vehicles with manual transmission.

2. Install cable duct of B+ line -5- at manual transmission.

INFORMATION:  For vehicles with automatic transmission.

3. Install cable duct of B+ line -5- at automatic transmission.

4. Screw down B+ line -5- at box for B+ line -4-.

4.1. Insert B+ line into the box and tighten with the fastening nut -Arrow A-. - Tightening torque: 23 Nm (17 ftlb.)
4.2. Close box for B+ line on transmission -Arrow B-.

Procedures|Page 2714 > < Procedures|Page 2712