944 S L4-2479cc 2.5L DOHC (1987)
Camshaft: Service and Repair
Installing Camshafts
Installing Camshafts
1.
Turn engine in direction of rotation by approx. 45° before ignition TDC (cylinder 1).
2.
Lay intake shaft and exhaust camshaft in the timing chain.
3.
Place both camshafts in the timing chain so that the cast lugs are aligned with the marked links of the chain. Oil the bearing journals and place in
the bearings carefully together with the timing chain.
Note: The distance between the marking on the intake camshaft and the marking on the exhaust camshaft amounts to 7 outer chain links; the
distance between the cast lugs measures approx. 113 mm.
4.
Fasten the camshafts to the cylinder head with assembly bridges Special Tool 9248 together with the clamping bolt of Special Tool 9226.