porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Procedures|Page 4793 > < Procedures|Page 4791
Page 4
background image

Installing B-pillar with control arm and lower lever

1. Press Teflon sleeves -1- at both sides into the bore on the convertible top support -2-.

2. Position B-pillar -3- with control arm and lever on convertible top support and join with the pin -4- (8 x 53 mm) -arrow-.
3. Press retaining clip -5- into the pin.
4. Place main folding top bow -1- in a vertical position. Position lower lever -2- on main folding top bow and join with the pin -3- (8 x 25 mm)

-arrow-.

5. Press retaining clip -4- into the pin.

Installing B-pillar seal

1. Place seal -1- on B-pillar -2- (-arrows A-) and position it correctly.

2. Pull seal receiver -3- in at the bore -4- on the B-pillar -arrow B-.
3. Screw down B-pillar seal on the door window aperture with the five fastening screws -5-.
4. Screw down B-pillar seal at the bottom of the B-pillar with the two fastening screws -6- (assembly tool with T15 insert 9744).

Installing front roof frame

1. Press Teflon sleeves -1- at both sides into the bores on the front B-pillar -2- and on the control arm -3-.

Procedures|Page 4793 > < Procedures|Page 4791