porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Procedures|Page 3061 > < Procedures|Page 3059
Page 58
background image

1.1. Screw down battery ground strap on the body with the fastening nut. - Tightening torque: 5 Nm (3.5 ft. lbs.)

2. Install B+ line for battery -2-.

2.1. Push the B+ line of the battery onto the mounting point at the power distributor as far as the stop. Check that the B+ line sits firmly.
2.2. Tighten B+ line to battery. - Tightening torque: 5 Nm (3.5 ft. lbs.)

INFORMATION:
-

The electric lines are located in the plenum panel and are thus exposed to the highest demands.

-

The greatest care must be used in the individual work steps for stripping insulation from, crimping, and shrinking/insulating the electric lines.

-

The procedure for stripping insulation from, crimping, and shrinking/insulating the electric lines must be complied with and observed. The
procedures are described in detail in the repair kit for harnesses NR.155-1.

-

Crimping samples are to be prepared before beginning work.

3. Crimp the positive cable.

3.1. Trim the new positive cable -4- to the -dimension X = approx. 20 cm- and strip the insulation.

3.2. Strip insulation off original positive cable of main wire harness -3- and push on the shrink-fit hose -5-.
3.3. Crimp crimping sleeve -6- using the hand crimping pliers from the repair kit for harnesses NR.155-1 to the positive cable -3-.
3.4. Crimp crimping sleeve -6- using the hand crimping pliers from the repair kit for harnesses NR.155-1 to the new positive cable -4-. Check the

crimp connection carefully.

3.5. Slide the shrink-fit hose over the crimp connection and carefully shrink it using the hot-air blower with special nozzle (recommended

accessories for the repair kit for harnesses) so that it is watertight.

3.6. Tie positive cable to the main wire harness with adhesive tape.

Installing B+ line from power distributor to engine connection point

1. Lay B+ line -3-.

Procedures|Page 3061 > < Procedures|Page 3059