porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Procedures|Page 3062 > < Procedures|Page 3060
Page 59
background image

2. Screw down B+ line -3- at box for B+ line -4-.

2.1. Insert B+ line into the box -Arrow A- and tighten with the fastening nut. - Tightening torque: 23 Nm (17 ft. lbs.)
2.2. Close box for B+ line on engine -Arrow B-.

3. Fasten B+ line -3- at centre tunnel.

3.1. Push B+ line under the carpet in the direction of travel.
3.2. Insert B+ line into the two holders -arrows-.

4. Clip in B+ line -3- at unit carrier

4.1. Push B+ line through the unit carrier and across the footwell air vent.
4.2. Clip in B+ line with retaining clip -arrow- at unit carrier.

5. Clip in B+ line -3- at heater/air-conditioning unit.

5.1. Secure B+ line to main wire harness with two new tie-wraps.
5.2. Clip in B+ line at heater/air-conditioning unit with the tie-wraps.

Installing B+ line from starter to engine connection point

Procedures|Page 3062 > < Procedures|Page 3060