porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Cooling System|Coolant > < Auxiliary Water Pump|Service and Repair|Page 1434
Page 3
background image

1.3. Slide water hoses onto the circulating pump -arrows C-.
1.4. Slide spring band clamps onto the connections using the assembly pliers for spring band clamps, Cayenne hose connections NR.72-1 (

-arrows D- ) and align with the markings.

1.5. Slacken spring band clamps -arrows E- and secure the hoses.

2. Connect the water tube to the threaded bolt -arrow- and secure with the fastening nut -1-. - Tightening torque: 6 Nm (4.5 ftlb.)
3. Connect plug connection for circulating pump.

3.1. Push the plug connection -arrow A- together until it engages securely.
3.2. Push plug connection onto holder -arrow B-.

3.3. Insert line into the line bracket -arrow C- and close line bracket -arrow D-.

4. Unscrew the hose clamp 3094 and remove it.

Subsequent work

1. Fill in coolant and bleed cooling system.
2. Install front left wheel housing liner.
3. Installing front left wheel.

Cooling System|Coolant > < Auxiliary Water Pump|Service and Repair|Page 1434