porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Oil Cooler, Engine|Service and Repair|Page 1265 > < Oil Cooler, Engine|Service and Repair|Page 1263
Page 3
background image

Unclipping PDCC line

2. Place a collection pan under the oil/coolant heat exchanger (oil cooler). Coolant and oil will run out during disassembly.
3. Loosen the clips on the coolant hoses at the oil/coolant heat exchanger and slide them onto the hoses -1 and 2-.

Oil cooler

3.1.

Clamp the hoses using hose clamp 3093 or hose clamp 3094.

3.2.

Pull off the hoses.

4. Unclip the coolant hose assembly on the oil/coolant heat exchanger (oil cooler) from the holder. -6-

Coolant return line

1 - Coolant pipe

2 - Coolant hose

3 - Holder

4 - Screw, M6 x 12

5 - Screw, M6 x 20

Oil Cooler, Engine|Service and Repair|Page 1265 > < Oil Cooler, Engine|Service and Repair|Page 1263