porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Diagram Information and Instructions|Page 4342 > < Diagram Information and Instructions|Page 4340
Page 5
background image

2. Open the oil filler screw -B- on the air conditioning compressor.
3. Empty approx. 60 cm3 of refrigerant oil out of the air conditioning compressor and into a measuring glass. The remaining quantity of oil (approx.

80 cm3) remains in the air conditioning compressor.

4. Always replace the sealing ring for the oil filler screw. - Tightening torque: 26 Nm (19 ftlb.)
5. Use fastening screws from the new air conditioning compressor. Replace O-rings and coat the new rings with refrigerant oil.
6. Position bushings on the air conditioning compressor.
7. Fit air conditioning compressor.

7.1. Carefully press lines -1 and 2- outwards -arrows C-.

7.2. Insert the air conditioning compressor -3- through the two lines -1 and 2- ( -arrow A- ) and turn to place it in installation position -arrow B-.

8. Secure air conditioning compressor.

8.1. Position air conditioning compressor and screw in fastening screw -4- but do not tighten yet.

INFORMATION:  Only for vehicles with Porsche Dynamic Chassis Control (PDCC).

8.2. Insert line bracket -1- ( -arrow- ) and position it correctly.

Diagram Information and Instructions|Page 4342 > < Diagram Information and Instructions|Page 4340