Cayenne S (9PA) V8-4.5L (2003)
Putting components down without mixing them up (cylinder bank 5-6 shown here as an example)
E Inlet side
A Outlet side
5 to 8 Cylinders
Installing flat-base tappets
1. Grease flat-base tappets with engine oil and reinsert into the camshaft housing.
2. Install camshafts.
Tightening torques