Cayenne S (9PA) V8-4.5L (2003)
Illustration shows cylinder bank 5-8
5. Secure oil line with new sealing ring -2- . To do this, tighten the upper fastening screw -3- of the oil line to 10 Nm (7.5 ft. lbs.).
6. Turbocharged engine (M48/50): Tighten sheetmetal bracket for turbocharger. To do this, tighten 2 fastening screws M8 x 20 to 23 Nm (17 ft. lbs.)
and screw with new nut to 30 Nm (22 ft. lbs.).