porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Drive Belt|Testing and Inspection|Page 2048 > < Drive Belt|Testing and Inspection|Page 2046
Page 15
background image

10. Join the positive crankcase ventilation line -1- and the control lead -2- of the by-pass valve at the separation points underneath the left-hand

deflection roller.

11. Insert pressure pipe components on the left and right-hand sides of the Y pipe into charge air cooler and tighten 2 fastening screws to 10 Nm (7.5

ft. lbs.).

12. Install left-hand hot film metro air flow sensor. Put bottom hose clamp into position and tighten. Then mount the electric plug.

13. Push control lead on the underside of the pipe components into the 2 fastening clips.

Drive Belt|Testing and Inspection|Page 2048 > < Drive Belt|Testing and Inspection|Page 2046