Cayenne S (9PA) V8-4.5L (2003)
Note:
^
Screws which are tightened with a torque angle must be replaced with new ones.
9. Fix front cardan shaft to transfer box with new screws. Initial tightening: 22 ftlb. Final tightening: 90 °
10. Screw in threaded joint on bottom section of gearshift bracket -arrows-. Tightening torque: 18 ftlb.
Subsequent work
Touching up for shift and selector cables
1. Install rear cardan shaft.
2. Fit engine guard.
3. Install top section of gearshift bracket.
4. Function test for shift mechanism:
^
Position of gearshift lever?
^
Possible to shift through all gears, including reverse gear?