porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Camshaft, Engine|Adjustments|Page 1270 > < Camshaft, Engine|Adjustments|Page 1268
Page 2
background image

Camshaft mount, cylinder bank 5 to 8

Information

The intake camshaft for cylinder bank 5 to 8 has a plastic loss preventer to prevent the high-pressure pump's drive coupling from falling off
If for some reason the plastic loss preventer was not installed, the drive coupling would fall off when the camshaft is removed. The high-pressure
pump and its drive mechanism will still work even without the plastic loss preventer.

2. Remove camshafts (according to cylinder bank) -1 and 2- -3 and 6- and place on a marked, clean surface. Turn the intake camshaft for cylinder

bank 1 to 4 so that it can be lifted up and out of the drive coupling for the vacuum pump.

Camshafts, cylinder bank 1 to 4

Camshafts, cylinder bank 5 to 8

Installing camshafts

Information

A data matrix coding is shown on the staking dihedron of the camshafts. This is a square black/white dotted marking used for electronic identification

Camshaft, Engine|Adjustments|Page 1270 > < Camshaft, Engine|Adjustments|Page 1268