porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Procedures|Page 4041 > < Procedures|Page 4039
Page 11
background image

10. Route main wire harness and fasten with four new tie-wraps. Shorten tie-wraps.

11. Close cover of main wire harness -B-.
12. Fold back carpeted floor -A- on the right side at the entrance.
13. If necessary after moisture leakage, place the vehicle in the drying cabin for 3 - 4 hours (overnight if necessary) at a temperature of approx 60°C.

14. Fold back carpeted floor and sound absorber -A- in the front right footwell.

Subsequent work

1. Investigate the moisture leakage using the traces of water. Take into account the description "Sealing front panel".
2. Install front right seat frame.
3. Install front right side section trim.
4. Install cover under right instrument panel.
5. Carry out work instructions after disconnecting the battery.

Procedures|Page 4041 > < Procedures|Page 4039