porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Removing and Installing Wire Harness For Starter Battery|Page 3674 > < Removing and Installing Wire Harness For Starter Battery|Page 3672
Page 4
background image

2. Screw down starter with the fastening screws -1-. - Tightening torque: 45 Nm (33 ftlb.)+8 Nm (+6 ftlb.)

3. Position lines -3 and 4- on starter -arrow- and screw down with the fastening nuts -1 and 2-. - Tightening torque: 18 Nm (13 ftlb.), - Tightening

torque: 6.5 Nm (5 ftlb.)

4. Secure electric change-over valve.

4.1. Position support -2- ( -arrow A- ) and screw down with the fastening screw -3-. - Tightening torque: 10 Nm (7.5 ftlb.)

Removing and Installing Wire Harness For Starter Battery|Page 3674 > < Removing and Installing Wire Harness For Starter Battery|Page 3672