porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Power and Ground Distribution > < Removing and Installing Wire Harness For Starter Battery|Page 3673
Page 5
background image

4.2. Push electric change-over valve -1- onto the support -2- ( -arrow B- ).

Subsequent work

1. Install fuel distribution pipe (fuel rail) on DFI engines.
2. Install intake-air distributor.
3. Connect the battery and carry out the work instructions.

Power and Ground Distribution > < Removing and Installing Wire Harness For Starter Battery|Page 3673