porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Front Subframe Mount|Service and Repair|Page 4501 > < Front Subframe Mount|Service and Repair
Page 2
background image

Preliminary work

1. Switch off level adjustment.

On vehicles with ORS, depressurize the system using the PIWIS Tester.

-

Before working on the vehicle, ensure that the ORS is engaged. The indicator light on the center console button must be OFF. If the indicator light
is on, follow the following procedure: Switch on the ignition and engage the road driving programme ] High Range [. The anti-roll bars must
engage audibly.

-

Before working on the ORS, always depressurize the system! To do this, close the PIWIS Tester and select ] Offroad Stabi (ORS) ] Drive links ]
Clock FA valve or RA valve [. The valve clocks (audibly) until the procedure is finished (approx. 20 seconds).

2. Lift the vehicle.
3. Remove underbody protection.

Tools and materials

Tools

Tool overview for chassis subframe bearings assembly fixture T10301

Tool overview for chassis subframe bearings

-A- - - Hydraulic cylinder VAS 6178 (The hydraulic cylinder is used together with the - foot pump VAS 6179 and the - pressure gauge with

connecting cable VAS 617911 -B-.)

Front Subframe Mount|Service and Repair|Page 4501 > < Front Subframe Mount|Service and Repair