porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Information Bus|Diagrams|Page 1613 > < Information Bus|Diagrams|Page 1611
Page 10
background image

Perform visual inspection of locking mechanisms, connector housings and contacts for possible damage, and exchange the damaged parts, if necessary.

Installing optical contacts on socket side

Remove the dust boot right before plugging.

Check the proper condition of the contact.

At a force of 10 N (7.5 lb.) the springs installed in the connection point will be compressed. This leads to an increase in attenuation, which could lead to
system impairment and system failure. Therefore a maximum force of 10 N (7.5 lb.) may be used to pull on optical waveguides at connection points.

1. Insert optical contact -B- into the optical waveguide module until it is felt to engage, and check the optical contact is seated securely.
2. Insert optical waveguide module into the connection point on the socket side.

Information Bus|Diagrams|Page 1613 > < Information Bus|Diagrams|Page 1611