Heating & ventilation (Operation): Description and operation
- Make
- Rover
- Model
- 200 Workshop Manual
- Year
- 1995–1999
- Section
- Description and operation › Operation
Heating & ventilationOperation
OPERATION
- Blower unit
- Heater duct
- Heater unit
- Blower switch
- Face level air flow control
- Air temperature control
- Recirculated air supply control
- Air distribution control
Parts & tools for this job For 1995 Rover 200
- TOOLA/C manifold gauge setSearch: AC manifold gauge set
- TOOLUV leak detection kitSearch: AC UV leak detection kit
- PARTCabin filterSearch: Rover 200 1995 cabin filter
Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.