saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Diagram Information and Instructions|Page 3086 > < Diagram Information and Instructions|Page 3084
Page 6
background image

This is done to ensure that there is no current already in the tested circuit and that the correct reading is obtained.

Testing for open circuits by measuring voltage.

1. Turn on the load.
2. Set the multimeter for measuring voltage and connect the negative lead of the voltmeter to a good grounding point.
3. Connect the positive lead of the voltmeter to the point where the voltage is to be read.
4. On the output side of switches/control modules, it is better to start checking from these and gradually work your way towards the load.

When there is no longer a voltage reading, you will have gone past the break point.

5. On the input side of switches/control modules/consumers, it is better to start at the power source (normally a fuse) and then move gradually

towards the switch/control module/consumer.
When there is no longer a voltage reading, you will have gone past the break point.

Testing for open circuits by measuring resistance

Diagram Information and Instructions|Page 3086 > < Diagram Information and Instructions|Page 3084