saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Diagram Information and Instructions|Page 3087 > < Diagram Information and Instructions|Page 3085
Page 7
background image

1. Make sure the component or lead to be tested is not under tension (e.g. by removing the relevant fuse).
2. Set the multimeter for measuring ohms and connect the ohmmeter to each end of the component/lead to be tested.
3. Jiggle the relevant wiring harness while observing the ohmmeter.

Normally, the resistance of a wiring harness is less than 1 Ohm. Specified values apply to components.

Testing for short circuits to ground

1. Make sure the lead being tested is not under tension (e.g. remove the relevant fuse) and that any loads are disconnected.
2. Set the multimeter for measuring ohms.
3. Connect one test lead to a good ground and the other to the point to be tested.
4. Carefully jiggle the wiring harness and make sure the multimeter reading shows infinite resistance (OL) all the time.

Measures After Changing A Control Module

Measures After Changing A Control Module

SPS programming

Connect Tech 2 and use TIS 2000 to check whether the control module requires programming. Go to the "SPS" menu and select "Read ECU data".

Diagram Information and Instructions|Page 3087 > < Diagram Information and Instructions|Page 3085